Non operator support

ADM provided support and input for a client with a non-operated interest in the Netherlands.

Our input was instrumental in the adoption of an optimal remedial plan to rectify a serious problem with a development well. The ADM analysis of the operator’s proposed fishing operation showed the extensive time required and the extremely low probability of success (essentially zero!).

By adopting the ADM proposed sidetracking programme a minimum expenditure of 10 days and $2m was avoided.