|
HPHT wells
High Pressure High Temperature (HPHT) wells have been
with the industry for a very long time, well before the
classification HPHT was developed.
ADM holds considerable HPHT experience
that stretches back to the early 1990’s. Our management
team and associates have worked on some cutting edge
HPHT wells.
This experience includes;
- Work on a jack up exploration well with a purpose
built 20,000psi BOP
- Drilling a deviated exploration
well
- Drilling slim HTHP hole – 2,537ft of 5-5/8” hole
ADM’s C.E.O., Robert MacAndrew, is currently HPHT
editor for the SPE’s Journal of Petroleum Technology
|