HPHT wells

High Pressure High Temperature (HPHT) wells have been with the industry for a very long time, well before the classification HPHT was developed.

ADM holds considerable HPHT experience that stretches back to the early 1990’s. Our management team and associates have worked on some cutting edge HPHT wells.

This experience includes;

  • Work on a jack up exploration well with a purpose built 20,000psi BOP
  • Drilling a deviated exploration well
  • Drilling slim HTHP hole – 2,537ft of 5-5/8” hole

ADM’s C.E.O., Robert MacAndrew, is currently HPHT editor for the SPE’s Journal of Petroleum Technology